Thursday, November 4, 1915
day 12
Work
(1) on space between G 5230 W and N
(2) on carrying out railroad embankment
(1) Between G 5230 W and N
Finished clearing space between G 5230 W and G 5230 N. Carried out plaster floor as it rested on sand. Hole dug by treasure hunters. Fragments of statues (limestone) and statuettes (granite, etc). Scraps of Roman pottery.
(2) Railroad embankment
Worked on railroad embankment - space north of G 5230 W.
[ILLUSTRATION]
x - line of surface of original floor. xx - a rough surface formed by casual excavation.
Arrived at face of G 5230 N going east.
Friday, November 5, 1915
day 13
Work
(1) carrying out railroad embankment over G 5237 and G 5236
(2) various cleaning operations in and around G 5230 N
(3) pit G 4940 A
(1) Railroad embankment
[ILLUSTRATION]
In pit G 5237 A, large part of a limestone head (statuette) [15-11-31].
(2) G 5230
Clearing dust from serdabs G 5230 N and clearing gravel from street east.
(3) G 4940
Clearing pit G 4940 A dumping into B.
Saturday, November 6, 1915
day 14
Work on
(1) G 4940 A
(2) carrying out railroad embankment
(1) G 4940
Clearing pit G 4940 A reached about 12 meters down.
(2) Railroad embankment
Carrying out railroad embankment over G 5332.
Storrs and Mrs. Hunter called.
microfilm: end page 28
Details
- ID
- HUMFA_Vol.09.p.028
- Alternate IDs
- HUMFA_Vol.09.p.028; Vol.09.p.028
- Department
- Harvard University-Boston Museum of Fine Arts Expedition
- Classification
- Documentation-Expedition diary pages
- Entry Date
- 11/04/1915; 11/05/1915; 11/06/1915
- Title
- Vol.09.p.028
- Credit Line
- Harvard University–Boston Museum of Fine Arts Expedition