Vol.20.p.654
Diary Transcription:
microfilm: begin page 654
Sunday, January 23, 1927 (continued)
(13) G 7430
Continued clearing debris.
Monday, January 24, 1927
eighth day of work
George A. Reisner was taken ill with influenza.
cars emptied:
line IX 6:45 am - 8:00 am: 37, 8:30 am - noon: 72, 1:00 pm - 4:30 pm: 76
Total 185
Work on:
(1) G 7242 top
(2) G 7248 top, B, C
(3) G 7254 around A [= Y], B
(4) G 7256 top, A, B, C, D, E
(5) G 7330 X pit
(6) G 7330 top
(1) G 7242
Clearing debris on east side to the south, on top. Found one fragment limestone, inscribed; one part ushabti.
(2) G 7248
Clearing debris on top of mastaba, and clearing pits B and C.
G 7248 B: Depth 3.05 meters, built of dubsh, no chamber.
G 7248 C: Depth 1.30 meters, built of dubsh and mud; debris, chamber on west, closed with stones.
[ILLUSTRATION]
(3) G 7254
Clearing debris around mastaba; wall of mastaba G 7254 below, running north-south, of stone blocks.
G 7254 A [= G 7254 Y]: Depth 1.45 meters, built of dubsh.
[ILLUSTRATION]
microfilm: end page 654
Details
- ID
- HUMFA_Vol.20.p.654
- Alternate IDs
- HUMFA_Vol.20.p.654; Vol.20.p.654
- Department
- Harvard University-Boston Museum of Fine Arts Expedition
- Classification
- Documentation-Expedition diary pages
- Entry Date
- 01/23/1927; 01/24/1927
- Title
- Vol.20.p.654
- Credit Line
- Harvard University–Boston Museum of Fine Arts Expedition
