Skip to main content
Diary Transcription:

microfilm: begin page 668

Sunday, January 30, 1927
thirteenth day of work

George A. Reisner now recovered went to lunch with Winship at Mena House.

cars emptied:
line IX 7:00 am - 8:00 am: 60, 8:30 am - noon: 180, 1:00 pm - 4:00 pm: 175
Total 415

Work on:
(1) G 7330
(2) G 7169 B, C
(3) G 7173 B, C
(4) G 7259 D
(5) G 7330 B
(6) G 7430 B
(7) G 7100 SW III [G 7100 SW 3]
(8) G 7100 SW VI [G 7100 SW 6]
(9) G 7100 SW VII [G 7100 SW 7]
(10) G 7100 SW IX [G 7100 SW 9]

(1) G 7330
Clearing on top of mastaba G 7330, and the Roman brickwork G 7300 Pt (1)[i] on top of mastaba.

(2) G 7169
G 7169 B: Finished clearing Pit B.
[ILLUSTRATION]
G 7169 C: Depth 2.35 meters, chamber closed with dubsh and stones.

(3) G 7173
G 7173 B: Depth 2.30 meters, chamber closed with stones.
G 7173 C: Down 1.0 meters, built of dubsh.

(4) G 7259
G 7259 D: Depth 10.90 meters, chamber on south, closed with dubsh of stones.

microfilm: end page 668

Details

ID
HUMFA_Vol.20.p.668
Alternate IDs
Vol.20.p.668; HUMFA_Vol.20.p.668
Department
Harvard University-Boston Museum of Fine Arts Expedition
Classification
Documentation-Expedition diary pages
Entry Date
01/30/1927
Title
Vol.20.p.668
Credit Line
Harvard University–Boston Museum of Fine Arts Expedition

Tombs and Monuments 11

Photos 1

Modern People 3

Published Documents 2