Vol.27.p.004
Diary Transcription:
microfilm: begin page 4
Friday, January 11, 1935 (continued)
(4) G 1219 (continued)
[Drawing of G 1219 C]
[ILLUSTRATION]
Saturday, January 12, 1935
Work on
(1) G 1025b B
(2) G 1047 D
(3) G 1210 A, B, C, D
(1) G 1025b
G 1025b B: Lined with dubsh, rock below. Down 3.1 meters. Sand, limestone debris and dubsh. Chamber on west cut in rock. Blocked with dubsh and bound with mud.
(2) G 1047
G 1047 D: Down 4.7 meters. Sand, limestone debris and dubsh and stones. Reached chamber I. Chamber on east cut in rock. No blocking.
(3) G 1210
G 1210 A: Removed chamber blocking. Sand, stones, dubsh and broken mud brick. Body [35-4-6] head on north.
G 1210 B: Removed the roof of the chamber. Sand, stones, dubsh, and broken mud brick.
G 1210 C: Removed the roof of the chamber. Sand, stone, dubsh, and broken mud brick.
G 1210 D: Removed chamber blocking. Sand, dubsh and broken mud brick.
Sunday, January 13, 1935
Work on
(1) G 1047 D
(2) G 1162 + 72 A [= G 1162+1172]
(1) G 1047
G 1047 D: Below chamber I. Sand, limestone debris and black debris. Total depth 7 meters. Reached chamber II. Chamber on south cut in rock. Blocked with stone and dubsh.
(2) G 1162 + 72 [= G 1162+1172]
G 1162 + 72 A: Lined with dubsh, rock below. Down 2.4 meters. Sand and stones. Chamber not reached.
Monday, January 14, 1935
Work on
(1) G 1162 + 72 A [= G 1162+1172]
(2) G 1457 a
(1) G 1162 + 72 [= G 1162+1172]
G 1162 + 72 A: Down 3.95 meters. Sand, limestone debris and black debris. Reached the chamber. Chamber on west cut in rock. Blocked with dubsh and stones. Not reached the rock in shaft.
(2) G 1457
G 1457 a: Men build a dubsh wall on the west of the west wall of the room.
Tuesday, January 15, 1935
Day of rest.
Wednesday, January 16, 1935
Work on
(1) G 1102
(2) G 1162 + 72 A [= G 1162+1172]
(3) G 1210 B, C
(1) G 1102
On east top of the mastaba. Sand, limestone debris, dubsh and black debris. Search for pits or stela.
(2) G 1162 + 72 [= G 1162+1172]
G 1162 + 72 A: Down 55.4 meters. Sand, white lime stone debris and dubsh. Chamber not reached.
(3) G 1210
G 1210 B: Removed debris from the chamber. Sand and silt deposited by rain. Body [35-4-7] head on north.
G 1210 C: Removed debris from the chamber. Sand and organic decay. Body [35-4-8] head on north.
microfilm: end page 4
Details
- ID
- HUMFA_Vol.27.p.004
- Alternate IDs
- Vol.27.p.004; HUMFA_Vol.27.p.004
- Department
- Harvard University-Boston Museum of Fine Arts Expedition
- Classification
- Documentation-Expedition diary pages
- Entry Date
- 01/11/1935; 01/12/1935; 01/13/1935; 01/14/1935; 01/15/1935; 01/16/1935
- Title
- Vol.27.p.004
- Credit Line
- Harvard University–Boston Museum of Fine Arts Expedition
