Skip to main content
Diary Transcription:

microfilm: begin page 258

Sunday, March 21, 1926 (continued)

(5) G 7140 [G 7135]
G 7140 Y [= G 7135]: Down 10.2 meters. Debris as before. Working pulley, throwing dirt in G 7130 Y.
G 7140 Z [= G 7135]: Down 8.5 meters. Debris as before. Dirt into G 7130 Y.

(6) G 7240
Clearing top of G 7240 south of pit i. Exposed irregular packing but no trace of pit.

(7) G 7240-i
Pit i (Saite): Down __ meters. Exposed chamber on west, and began clearing it of dirty thieves debris.

Monday, March 22, 1926
One hundred and sixth day of work.

Another bad day, south wind.

Workmen:
ninety-five (95)

Work on:
(1) G 7000 X
(2) street G 7100 S
(3) G 7140 Y, Z [= G 7135]
(4) Saite-Ptolemaic G 7141, and G 7141-i
(5) G 7240-i

Cars emptied:
Line VII to 8:00 am: 55, 8:30 to noon: 130, 1:00 to 5:00 pm: 125
total: 310

(1) G 7000 X
Removed [Nos.] 267a, b, c and 268 (1)-(22)
No. 267: Decayed wood of inlaid wing. Removed this and exposed crumbled plaster of lower inlays, removed crumbled plaster with wet brush, exposed backs of inlays.
*B5923: backs of inlays (face down)
Dows Dunham drew plan.
Removed and set together 268 (1)-(22), part of wing.

microfilm: end page 258

Details

ID
HUMFA_Vol.17.p.258
Alternate IDs
HUMFA_Vol.17.p.258; Vol.17.p.258
Department
Harvard University-Boston Museum of Fine Arts Expedition
Classification
Documentation-Expedition diary pages
Entry Date
03/21/1926; 03/22/1926
Title
Vol.17.p.258
Credit Line
Harvard University–Boston Museum of Fine Arts Expedition

Tombs and Monuments 6

Photos 1

Modern People 2